Upright mounting bracket
The upper mounting arrangement positions the hammer in line with vertical impact work.

An open-frame hydraulic breaker with an upper mounting bracket for rock breaking, concrete removal and vertical work. Match the breaker to the carrier and hydraulic circuit.
An open-frame hydraulic breaker with an upper mounting bracket for rock breaking, concrete removal and vertical work. Match the breaker to the carrier and hydraulic circuit.
The upper mounting arrangement positions the hammer in line with vertical impact work.
The fixed top bracket connects the hammer body to the excavator linkage for controlled positioning.
The hammer transfers repeated piston impacts through the chisel into rock or concrete.

Compare machine weight, hydraulic flow and pressure together. Hammer weight differs between side, top and box configurations.
Pressure unit: kgf/cm². This table retains its original numerical values. Pressure is not shown in bar.
| Model | Chisel diametermm | Excavator operating weightt | Hammer weightkg | Operating pressurekgf/cm² | Hydraulic oil flowL/min | Blow frequencybpm | Hose diameterinch |
|---|---|---|---|---|---|---|---|
| JY-T05 | 35 | 0.5-1 | 75 | 90-120 | 15-25 | 800-1450 | 1/2 |
| JY-T10 | 40 | 0.8-2.5 | 86 | 90-120 | 15-25 | 800-1450 | 1/2 |
| JY-T20 | 45 | 1.2-3.0 | 108 | 90-120 | 20-30 | 700-1200 | 1/2 |
| JY-T30 | 53 | 2.5-4.5 | 176 | 90-120 | 25-50 | 600-1100 | 1/2 |
| JY-T35 | 60 | 2–5 | 232 | 90-120 | 25-50 | 600-1100 | 1/2 |
| JY-T40 | 68 | 4–7 | 287 | 110-140 | 40-70 | 500-900 | 1/2 |
| JY-T43 | 75 | 6–9 | 375 | 120-150 | 50-90 | 400-800 | 1/2 |
| JY-T45 | 85 | 7–14 | 673 | 130-160 | 60-100 | 400-800 | 3/4 |
| JY-T50 | 100 | 10–15 | 922 | 150-170 | 80-110 | 350-700 | 3/4 |
| JY-T60 | 125 | 15-18 | 1,666 | 150-170 | 80-110 | 350-700 | 3/4 |
| JY-T70 | 135 | 17-25 | 1,798 | 160-180 | 130-150 | 400-800 | 1 |
| JY-T81 | 140 | 18-26 | 1,976 | 160-180 | 120-180 | 350-500 | 1 |
| JY-T81A | 140 | 18-26 | 2,065 | 160-210 | 120-180 | 400-550 | 1 |
| JY-T100 | 150 | 26-30 | 2,133 | 160-180 | 150-210 | 350-450 | 1 |
| JY-T121 | 155 | 28-32 | 2,613 | 160-180 | 180-240 | 300-450 | 1¼ |
| JY-T131 | 165 | 30-35 | 2,783 | 160-180 | 200-260 | 250-400 | 1¼ |
| JY-T140 | 165 | 32-38 | 3,043 | 160-180 | 210-270 | 250-380 | 1¼ |
| JY-T151 | 175 | 37-45 | 3,643 | 160-190 | 210-290 | 200-350 | 1¼ |
| JY-T185 | 185 | 45-50 | 5,443 | 205-245 | 220-270 | 180-200 | 1¼ |
| JY-T195 | 190 | 48-55 | 6,043 | 225-265 | 270-330 | 180-200 | 1¼ |
| JY-T210 | 210 | 60-75 | 6,593 | 245-285 | 290-350 | 150-180 | 1¼ |
On smaller screens, swipe the table sideways to see every specification.
Before ordering, send the machine identification and the connection, power and working information relevant to this product.
Excavator model, operating weight and mounting connection.
Available flow, pressure, return pressure and relief settings.
Tool diameter and point or chisel suitable for the material.
Material, access, duty cycle and lubrication requirements.
No. Compare oil flow, pressure, return requirements, mounting and attachment mass with the selected model.
Compare the bracket or housing dimensions, mounting connection and available working clearance for the intended breaking task.
Choose the specified point or chisel for the material and work. Rock breaking and concrete demolition can require different working tools.
Yes. Confirm the hammer circuit, pressure, flow and return arrangement against the installation instructions. Do not infer suitability from pin fit alone.